Shaping Crete’s New Gateway
PREPARE FOR TAKE OFF FROM THE NEW AIRPORT IN 2027
Set to open in 2027, the new airport is designed to become the second largest gate of Greece. Stretching over a land of 600 hectares, with a state-of-the-art 3,200-meter runway and the capacity to welcome over 15 million passengers annually, this cutting-edge facility is designed to support Crete’s development.

93,000 m2

MAIN TERMINAL BUILDING

Up to 15 mil passengers

DESIGN TERMINAL CAPACITY

3.2 Km

RUNWAY
Prepare for Take-off from the New Airport in 2027

Strategically located in the heart of Crete, the airport is designed to become a regional leader and set a new benchmark for regional airports across the Mediterranean.

Spanning 93,000 square meters, the main terminal is designed to accommodate an estimated 15 million passengers annually. The airport will feature a runway of 3.2 km, 60m wide, and an air traffic control tower of 44m. height, and top-tier support facilities.

We are committed to balancing security with passenger convenience, ensuring that safety measures are in place without compromising comfort and ease of our passengers. By implementing efficient processes and leveraging advanced technologies, we aim to deliver a seamless, fast, and secure experience for all travelers. To create a personalized and efficient journey, the airport is being designed with a focus on customer-centric solutions. From streamlined check-in to smooth boarding, we will integrate biometric systems, automated control procedures, and smart technologies to meet the needs of today’s travelers.

EXPERIENCE HASSLE-FREE SECURITY WITH OUR ADVANCED SYSTEMS

One of the key innovations will be the introduction of C3 Security Lanes, the latest security technology, and we will be the first airport in Greece to implement it. This advanced system enhances security while improving the passenger experience, as it eliminates the need to separate electronic devices and liquids from personal belongings. By simplifying the security process via technological innovation and incorporating the Automatic Tray Return System, we aim to achieve a higher level of security while offering passengers a smoother, more convenient journey. 

FAMILY-FOCUSED AND PET-FRIENDLY: A NEW ERA OF AIRPORT COMFORT

In addition, our design and facilities are thoughtfully crafted to welcome families with kids, ensuring their travel is stress-free and enjoyable. We also prioritize the needs of travelers with pets, treating pets with the same care and consideration as passengers.

Through automation, innovation, and a commitment to customer-centric solutions, we aim to create a seamless experience, making air travel more efficient, enjoyable, and tailored to the needs of our passengers.

Our goal is to redefine the airport experience, setting a new benchmark for air travel in Greece and the Mediterranean.

BALANCING INNOVATION, COMMUNITY, AND ENVIRONMENT

Our company is committed to managing the airport with a holistic approach, recognizing our responsibility to the environment, our employees, local stakeholders, and the wider community. Through innovative practices and advanced infrastructure, we aim to exceed the expectations of both visitors and residents, delivering an airport that reflects the unique character and potential of Crete.

The airport is designed with sustainability at its core. Every element, from the materials used to the energy-efficient systems implemented, is focused on minimizing environmental impact. The new terminal is being built to achieve LEED Silver certification, ensuring high standards of sustainable construction and environmental performance. Additionally, the airport’s infrastructure is being developed to address potential impacts such as climate change, ensuring long-term site resilience and viability.

This new hub isn’t just about functionality; it’s about shaping the future of travel in Crete. By delivering exceptional service and promoting sustainable growth, the airport will not only transform travel in Crete but also set a new standard for the region and beyond.

New airport key points

76

TOTAL CHECK IN COUNTERS – FROM WHICH 10 OF THEM SELF SERVICE

8

SECURITY SCREENING POINTS OF LATEST TECHNOLOGY - C3 SECURITY LANES

19

TOTAL BOARDING GATES – 10 BRIDGES AND 9 BUS GATES

7

BAGGAGE RECLAIM BELTS

24 km

OF NEW ROADS CONNECTING THE AIRPORT TO THE NORTH AND SOUTH

1,380

VEHICLES PARKING SPOTS + 96 (TBC) CHARTER BUS SPOTS + COURTESY

44m

HEIGHT AIR TRAFFIC CONTROL TOWER

7.5 Km3

FUEL HYDRANT SYSTEM CAPACITY

58

TOTAL STANDS APRON - CONTACT STANDS: 5 CODE E OR 10 CODE C | REMOTE STANDS: 27 CODE C & 1 CODE E OR 2 CODE C, 16 CODE B, 3 HELIPADS
Airport Layout
42.5%
AIRPORT LOADING
Progress Update
Terminal
Runway and Apron
Control Tower